State of the Owyhee Map: 10/01/09
What is left:
1. I need to do a full pass through the entire map and fix the topology and the line attribution and final fine-tuning. I have already started this in the Hole in the Ground area.
2. Unit descriptions need to be written up using Cooper's thesis as a base. This part will require input from all principal members of the research team
3. Accompanying text to the map. This will be a detailed accounting of the geologic history implied / required by the geologic map.
4. Send the whole package out for review. Likely, we will do this through DOGAMI who have agreed to publish the map if we can cover most / all of the costs.
Now, back to the lower Walker River map due in 15 days.